| 1 |
Search Results |
 |
#4 Hydrotreater - Civil & Mechanical
| Location: |
Ponca City, OK |
| Description: |
Civil & Mechanical for the #4 Hydrotreater |
| Built By: |
Teton Industrial Construction, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Ash Grove Foreman Cement Plant Modernization Project
| Location: |
Foreman, AR |
| Description: |
Provide construction services for the erection of a 4,650 STPD cement line. |
| Built By: |
Teton Industrial Construction, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Box Reformer Hydrogen Unit - 80 SCFD Civil & Underground
| Location: |
El Segundo, CA |
| Description: |
Installation of all civil and underground work associated with the erection of an 80 SCFD Hydrogen Plant |
| Built By: |
Teton Industrial Construction, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Currant Creek HRSG Installation
| Location: |
Mona, UT |
| Description: |
Install 2 Vogt HRSGs for Shaw Constructors. All material is supplied by others. |
| Built By: |
Teton Industrial Construction, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
JEA Kennedy Generating Station CT8 Project
| Location: |
Jacksonville, FL |
| Description: |
Engineering, procurement, and installation of equipment of materials for combusion turbine generator. |
| Built By: |
Teton Industrial Construction, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Luna Energy Facility - 600 MW Combined Cycle Power Plant
| Location: |
Deming, NM |
| Description: |
600 MW Combined Cycle Power Plant |
| Built By: |
Teton Industrial Construction, Inc. |
|
|
|
|
 |
Marshall FGD Project - Ductwork & Steel Erection
| Location: |
Terrell, NC |
| Description: |
Duct fabrication and erection at FGD (Flue Gas Desulfurization) Plant |
| Built By: |
Teton Industrial Construction, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Motiva Crude Expansion Project - OSBL GC 1 & 2
| Location: |
Port Arthur, TX |
| Description: |
OSBL GC 1 & 2 |
| Built By: |
Teton Industrial Construction, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Navasota Colorado Bend - Wharton - Texas - 2X1 Combined Cycle Power Plant - Phase II
| Location: |
Wharton, TX |
| Description: |
Phase II Turn-key construction of a 2x1 GE-7EA gas turbines on a GE-105 Steam turbine. |
| Built By: |
Teton Industrial Construction, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Navasota Colorado Bend- Wharton Texas Site - 2x1 Combined Cycle Power Plant
| Location: |
Wharton, TX |
| Description: |
Turn-key construction of a 2x1 GE-7EA gas turbines on a GE-105 Steam turbine. |
| Built By: |
Teton Industrial Construction, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Navasota Quail Run - Odessa - Texas - 2X1 Combined Cycle Power Plant
| Location: |
Odessa, TX |
| Description: |
Turn-key construction of a 2x1 GE-7EA gas turbines on a GE-105 Steam turbine. |
| Built By: |
Teton Industrial Construction, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Navasota Quail Run - Odessa - Texas - 2X1 Combined Cycle Power Plant - Phase II
| Location: |
Odessa, TX |
| Description: |
Phase II Turn-key construction of a 2x1 GE-7EA gas turbines on a GE-105 Steam turbine. |
| Built By: |
Teton Industrial Construction, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
OUC Stanton Energy Center - Brine Concentrator & Demineralizer Project
| Location: |
Orlando, FL |
| Description: |
Industrial Water Brine Concentrator/Demineralizer Project |
| Built By: |
Teton Industrial Construction, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Plant Scherer By-Pass Outage & Light Structural Steel Package
| Location: |
Juliette, GA |
| Description: |
By-Pass Outage and Heavy & Light Structural Steel at Plant Scherer |
| Built By: |
Teton Industrial Construction, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Santee Cooper Cross Unit 4 - Mechanical
| Location: |
Cross, SC |
| Description: |
Mechanical Equipment Erection to an existing coal-fired power plant which will add 640 megawatts. |
| Built By: |
Teton Industrial Construction, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
SCR J.T. Deely Unit #2 SCR Retrofit Project
| Location: |
San Antonio, TX |
| Description: |
Unit 2 Retrofit |
| Built By: |
Teton Industrial Construction, Inc. |
| Delivery Method: |
[EPC] Engineer/Procure/Construct |
|
|
 |
TOTAL Deep Conversion Sulfur Block
| Location: |
Port Arthur, TX |
| Description: |
Deep Conversion Sulfur Block |
| Built By: |
Teton Industrial Construction, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
ULSD - Sweeny - Mechanical, Piping, and Steel
| Location: |
Sweeny, TX |
| Description: |
Civil, Structural, Mechanical, Process Piping, and Steel on the Clean Fuels project. |
| Built By: |
Teton Industrial Construction, Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
| |
| 1 |