Project Description
The facility will consist of the installation of (2) 275 megawatt, 2X1 Combined Cycle Power Plants with GE 7EA Gas Turbines, Deltak Heat Recovery Steam Generators and a GE 5C Steam Turbine and all associated equipment. The power generation facility will be constructed over a 14-month period and is to be ready for operation by May 1, 2007.
|