 |
 |
 |
Location:
Odessa, TX
Built By:
Teton Industrial Construction, Inc.
|
|
 |
Project Description
Phase II consists of the installation of a 275 megawatt, 2X1 Combined Cycle Power Plant with GE 7EA Gas Turbines, Deltak Heat Recovery Steam Generators and a GE 5C Steam Turbine and all associated equipment. Once Phase I and Phase II are complete the 550 MW gas fired power plant will provide power that can be transported to Dallas or Houston markets on existing grids.
|
Contact
For similar projects contact:
OwnerNavasota Energy LLC
|
 |